Hi
I am using INNOVUS for P&R my design. In each run of place and routing some short circuit violations are observed on Metal1 after running geometry verification. The location of the violations change in each run of generating the layout. I wonder if anybody can help me to solve this problem.
Thanks in advanced.
Ati